CASE: ZNA Hospital (Antwerp, Belgium)

The ZNA Hospital is a new hospital in the city of Antwerp (Belgium). It is very unique, because it is one of the first high-rise hospitals in the country. The hospital has 21 floors, of which 19 are above ground. The total surface of the project is almost 100.000 m2.

​

Airdeck was selected as the lightweight floor system for the total hospital structure (including the underground parking). Flexibility in the project was very important and Airdeck came up with a tailor made drilling protocol to allow future drillings in the hospital building structure. The contractor was also able to have a good construction speed by using Airdeck. 

​

The building structure is now finished and about 100.000 m2 of Airdeck panels were installed.

​

On the ground level, a tram will make a new connection in the Antwerp area. The tramway was installed on top of the Airdeck elements.

Parties involved

Airdeck vloeren

Video footage

Drone movie

Timelapse movie

This video shows the general construction speed of Airdeck in the project ZNA (Antwerp, Belgium)

Pictures of the project

ZNA 1

Foundation works

ZNA 2

Airdeck elements are installed and connected to a precast wall

ZNA 3

Aerial view: Airdeck elements on level -1

ZNA 4

Aerial view: the punching zones on the Airdeck elements are visible

ZNA 5

Detail of a punching zone. Upper reinforcement to be installed

ZNA 6

Detail of a connection to a precast wall (using STABOX)

ZNA 7

Installation of Airdeck elements with the tower cranes

ZNA 8

Airdeck saves a lot of labour. The elements can be installed by 2 workers.

ZNA 9

You can safely work and wolk on the Airboxes

ZNA 10

Upper reinforcement is installed on the Airdeck elements

ZNA 11

Detail of the temporary props on which the Airdeck elements are installed

ZNA 12

Delivery of Airdeck elements on trailers

ZNA 13

The Airdeck elements are picked up directly from the trailer

ZNA 14

Airdeck elements on level +19

ZNA 15

Installation of Airdeck elements on level +19

ZNA 16

Aerial view of level +19

ZNA 17

Backpropping of the Airdeck floor

ZNA 18

Detail of column-airdeck connection

ZNA 19

Corings are perfectly possible into the Airdeck floor

ZNA 20

Detail of typical MEP drillings (under bathroom)

ZNA 21

Detail of typical MEP drillings (under bathroom)

ZNA 22

Detail of typical MEP drillings (under bathroom)

ZNA 23

Shafts, next to the stiff cores, are integrated in the Airdeck floors

ZNA 24

MEP is installed directly under the flat soffit of an Airdeck floor (before the false ceilings are put into place)

ZNA 25

Aerial view of the total project